Railway Operations

  • EVD Dynamic Sdn Bhd
    • Consultancy Services for the Ergonomic Study for KVMRT SSP Line Integrated Control Supervisory System and Computerized Maintenance Management System – Kuala Lumpur, Malaysia (2017 – 2018)
      • Ergonomic Study and Design for OCC of KVMRT SSP line

  • Sapura Secured Technologies
    • Consultancy Services for the Ergonomics / Human Factor Study for KVLRT Line 3 Telecommunications System (2018)
      • Conduct studies covering Human Factor issues, relevant human reliability and ergonomics assessment to determine the optimum operational and maintenance provisions under normal, degraded and emergency circumstances. The detailed design of OCC control room is also assessed based on the human factors considerations as stipulated on the applicable standards.

  • MMC Gamuda
    • Production of Operation and Maintenance Procedures for  the railway systems for Berapit Tunnel of Electrified Double Track Project – Northern Section – Perak, Malaysia (2013)
      • Support in the compilation of O&M Manuals for the Malaysian Double Tracking Project.

  • Konsortium Colas-CMCE-Uniway
    • Kelana Jaya LRT extension O&M Manual update – Kuala Lumpur, Malaysia (2016)
      • O&M documentation preparation and review and System Assurance documentation review

  • EVD Dynamic Sdn Bhd / Siemens
    • Ergonomic Study and Design for the Help Point, MMI, operational facilities for KL LRT 3
error: