System Engineering / System Assurance

  • Kum Shing Construction Co Ltd
    • Improvement of internal systems on system engineering and system assurance
      • Set up a System Engineering Framework for the Client including the production of the procedures for Interface Management, Testing and Commissioning Management, Project Risk Management, Preliminary Hazard Analysis (PHA) & Interface Hazard Analysis (IHA) Management and System Assurance Management.
       
      • KDL had conducted a complete assessment on the capability of the entire company so as to derive a competence matrix on various aspects of system assurance and system engineering. This served as the basis for the subsequent training sessions to be conducted by KDL to the relevant Client’s staff. In addition, a Hazard Identification workshop was conducted as led by KDL in order to identify all the major hazards for the company in carrying out their project works. Towards the end, training courses were held for the Client’s staff with KDL expert trainers on three key subjects, Operations and Maintenance consideration for railway, System Assurance processes and System Interfaces and Integration.

  • EVD Dynamic Sdn Bhd
    • Provision of EMC Management and Control Plan, Ergonomic Study Report and Other associated Coordination Analysis, Design Development, Submission and On-Site support works (2018-2022)
      • EMC Management and SA support to ICSS and CMMS System Package in MRT SSP Line

  • KONSORTIUM COLAS-CMCE-UNIWAY
    • LRT Extension System Assurance – Kuala Lumpur, Malaysia
      • System Assurance Management in the LRT Extension project.

  • Roctec Technology Limited HK
    • Consultancy Service on SA (System Assurance) and ISA (Independent Safety Assessor) Supports of MTR K-1837-15E Light Rail iSPS System Project (2017-2018)
      • System Assurance management, SA documentation preparation, and all SA activities including HAZOP workshops, SA Analysis, design safety reviews etc.

  • Sapura Secured Technologies
    • Services For The Systems Assurance Manager, Documentation and Works for KVMRT Line 2 SSP-SY-206 Communications, Government Integrated Radio Network, Commercial Telecom And Information Technology System Works Package Project (2018-2022)
      • SA management to Communications System Package in MRT SSP Line.

  • MTR Corporation Limited
    • MTR Light Rail (2021)
      • Consultancy Service on Independent Safety Assessor Support, System Assurance Management, System Assurance Documentation Preparation, and all System Assurance Activities including HAZOP Workshops, Design Safety Reviews, etc.
    • MTR Macao LRT Network (2022)
      • Barra Station – To perform System Assurance, Quality Management and System Interface Management for the Project.
error: