Hong Kong MTR Corporation Limited – Refurbishment of Oil Leakage Service Transformers in AT and D (Phase 2)
Contractor for Contract PO1183019 C9063.02 Refurbishment of Oil Leakage Service Transformers in AT&D (Phase 2) to refurbish 20 nos. of existing
  • Client
    Hong Kong MTR Corporation Limited - Refurbishment of Oil Leakage Service Transformers in AT and D (Phase 2)
  • Location
    Hong Kong SAR
  • Start Date
    2025
  • End Date
    2026
Services Provided
    • Key Direction Limited (KDL) is appointed as the Contractor for Contract PO1183019 C9063.02 Refurbishment of Oil Leakage Service Transformers in AT&D (Phase 2) to refurbish 20 nos. of existing

 

    11kV/433V station services transformers with the rating from 400 KVA to 1800 kVA. It is South Wales silicon insulation oil-filled type transformer located in HOK, KVB, TKV, LCT, LAK, TSY, ELT, SST and SDT. The associated necessary equipment and material including LV cable box & gland plate, gasket and O-rings for all transformer joints, bracket for LV cable box, copper short links for fixing of tap selector will be provided and installed. The associated transformer silicone insulating oil will be replaced. Flexible copper links for LV cable connection to LV bushing will be added. The Silka floor coating inside the transformer bund wall area will also be provided. The Contract Period shall be at a period of 92 weeks and 52 weeks Defect Liability Period.

Start typing and press Enter to search

Shopping Cart